course scheduling中文,course scheduling的意思,course scheduling翻译及用法

2025-09-06 21:24 浏览次数 8

course scheduling

课程表

course scheduling 例句

英汉例句

  • in recent years, using the genetic algorithm to solve the course scheduling problem is a hot point.

    近年来,使用遗传算法求解排课问题是一个热点。

  • course scheduling system for this paper to achieve these three goals:first, course scheduling system to be implemented is suitable for most domestic universities「need;

    本文对排课系统的研究要达到这三个一是实现排课系统能适合国内大部分高校需要;

  • therefore, must aim at my school the special details to develop easy to operate and efficient course scheduling software.

    所以,必须针对我校的具体情况开发出便于操作且高效的排课软件。

  • however, the general course scheduling software in the classroom utilization rate of about 60% below, and my school classroom utilization of nearly 100%.

    然而,一般排课软件的教室利用率约在60%以下,而我校的教室利用率将近100%。

  • course scheduling algorithm description in describing the algorithm to some of the concepts before we talk about clear.

    排课算法描述在描述算法之前我们把一些概念先讲清楚。

  • in this paper, the following three aspects to create course scheduling system:1. the separation of knowledge of arranging course and application.

    本文从如下三个方面来建立排课系统:1。排课知识与应用程序的分离。

  • the author gives an genetic algorithms solution to the problem, and then provides the chromosome coding schemes and fitness function to design and realize the course scheduling system.

    利用遗传算法进行问题求解,给出染色体编码方案和适应度函数,设计并实现了排课系统。

  • this article elaborated has acted according to the actual situation on the development of the b/s model course scheduling system through computer networks courses students inquiry;

    本文论述了根据我院实际情况开发的基于b/s模式的排课系统,通过计算机网络实现学生的课程查询;

  • according to irwin boutoul, a software engineer at google, "we actually didn」t design this system with universities in mind - we designed it as a course scheduling tool for enterprises.

    实际上,inwinboutoul,一个google的工程师披露:“整个系统在一开始并不是为大学设计的。我们是想做一个面向企业的课程管理的工具。

  • this thesis analyses the soft and hard constraints conditions of the course scheduling problems, and, quantifying the soft constraints, as well as establishing a corresponding mathematical model.

    分析了排课问题的软硬约束条件,量化了软约束条件。建立了相应的数学模型。

  • a strong course scheduling functions, tables, links, is the first choice to meet the teacher, because one can do for myself is!

    课程管理系统!有很强的排课功能,表多,联系多,是应付老师的首选,因为一看就是自己做的! -course management system。

  • course scheduling algorithms commonly used are the advantages and disadvantages, the most important are:algorithms and rules are coupled together.

    常用的排课的算法都有优势和不足,最主要的是:算法和规则是耦合在一起的;

相关热词