the article analyzes the cause of coal and gas outburst in heading face and introduces ways, control gas outburst in heading faces with three-soft coal seam.
the practice demonstrates that the prediction to adverse geologic condition in front of the heading face by boring radar and beam electric method, especially to water-holding condition, is satisfied.
mine ventilation frequency wet dust removal system for the heading face of coal mine dust in air.
矿用通风湿式变频除尘系统,用于对煤矿井下掘进工作面的空气进行除尘。
therefore, in this paper, the safety assessment index system of gas explosion hazard in heading face is established on the basis of comprehensive analysis.
as forced draught was used, a distance less than 10 m from the venting duct to heading face was suitable.
采用压入式通风时,风筒口距工作面在10米以内较适宜。
advancing hole is one of local prevent outburst measure at coal road heading face in coal-and-gas outburst mine.
超前鉆孔是煤与瓦斯突出矿井中煤巷掘进工作面的局部防突措施之一。
the direct prediction method mainly includes forward boring starting from heading face and pilot heading.
直接预报方法主要有掌子面的超前鉆探、超前平导法等;
simulated experiment and study were conducted in the speedy heading face in a soft rock roadway with mixed dust collection system and kc-061 wet cyclone dust collector.