tailing dam中文,tailing dam的意思,tailing dam翻译及用法

2025-11-25 04:49 浏览次数 11

tailing dam

英[ˈteiliŋ dæm]美[ˈtelɪŋ dæm]

尾矿坝

tailing dam 片语

片语

Tailing Filling Dam尾矿坝

tailing dam construction尾矿筑坝

tailing dam security尾矿库安全

tailing dam evaluation尾矿坝评价

Changpo tailing mine dam长坡尾矿坝

high tailing dam foundation高尾矿坝地基

construction of tailing dam尾矿筑坝

high tailing dam高尾矿坝

tailing dam 例句

英汉例句

  • Planting grass on tailing dam is one of the effective ways for the safety and management of the tailing dam, this not only makes the dam wind resistant, but also beautifies the environment.

    在尾矿坝植被种草,是对尾矿坝进行安全管理行之有效的方法之一,它不仅可以防风固砂,同时还起到美化环境的作用。

  • The calculation methods for common dam-break water flow are studied, such as the average width of dam-break, the maximum flow at tailing dam and the flow graph at tailing dam.

    研究了常见溃坝水流计算方法,例如溃口平均宽度、坝址最大流量、坝址流量过程线等。

  • Some deformation surveying methods are used in the safety monitor of tailing dam in the operation period in this paper.

    将现有的各种变形测量的方法用于尾矿坝运行期间的安全监测,并叙述了相关的数据处理方法,具有重大的现实意义。

  • Red mud is the high alkaline tailings from the production process of alumina, the tailing dam of red mud has adverse environmental impacts and its vegetation construction can be very difficult.

    赤泥是氧化铝生产中排出的高堿性尾矿,赤泥堆场对环境造成不良影响,植被恢复困难。

  • Control of saturation line is one of important points in tailing dam monitoring, which plays an important role in tailing dam safety.

    浸润线的控制是尾矿库监测重点内容之一,对尾矿库安全起着至关重要的作用。

  • The seepage stability of tailing dam is of great importance to the dam structure stability and therefore, the analysis of seepage field is an important content of tailing dam engineering research.

    尾矿坝的渗流稳定对结构稳定有重要影响,渗流场分析是尾矿坝工程研究的重要内容。

  • To ensure the heightening engineering of tailing dam to successfully carry through, siphonic drainage system was adopted to lower the phreatic line in the dam.

    为保证尾矿坝加高工程的顺利实施,采用虹吸排渗系统来降低坝体内部的浸润线高度。

  • To monitor the height oftailings dam and forecast its trend, a designed method based on gray system theory to create the model of tailing dam saturation line is presented.

    为了实现对尾矿坝浸润线高度进行实时在线监测及趋势预测,提出了用了灰色系统理论来对尾矿坝的浸润线数据建立灰色模型的方法。

  • The test results provide basic data for the stability evaluation of the Yangla copper tailing dam under a magnitude 8 earthquake.

    为羊拉铜矿尾矿坝在8度地震作用下的稳定性分析提供了基础资料。

  • It is pointed out that safe sealing for the flood drainage system of the tailing dam has a direct influence on the safety of the tailing dam.

    指出尾矿库的排洪系统能否安全封堵直接影响到尾矿库的安危。

相关热词