Planting grass on tailing dam is one of the effective ways for the safety and management of the tailing dam, this not only makes the dam wind resistant, but also beautifies the environment.
The calculation methods for common dam-break water flow are studied, such as the average width of dam-break, the maximum flow at tailing dam and the flow graph at tailing dam.
研究了常见溃坝水流计算方法,例如溃口平均宽度、坝址最大流量、坝址流量过程线等。
Some deformation surveying methods are used in the safety monitor of tailing dam in the operation period in this paper.
Red mud is the high alkaline tailings from the production process of alumina, the tailing dam of red mud has adverse environmental impacts and its vegetation construction can be very difficult.
赤泥是氧化铝生产中排出的高堿性尾矿,赤泥堆场对环境造成不良影响,植被恢复困难。
Control of saturation line is one of important points in tailing dam monitoring, which plays an important role in tailing dam safety.
浸润线的控制是尾矿库监测重点内容之一,对尾矿库安全起着至关重要的作用。
The seepage stability of tailing dam is of great importance to the dam structure stability and therefore, the analysis of seepage field is an important content of tailing dam engineering research.
尾矿坝的渗流稳定对结构稳定有重要影响,渗流场分析是尾矿坝工程研究的重要内容。
To ensure the heightening engineering of tailing dam to successfully carry through, siphonic drainage system was adopted to lower the phreatic line in the dam.
为保证尾矿坝加高工程的顺利实施,采用虹吸排渗系统来降低坝体内部的浸润线高度。
To monitor the height oftailings dam and forecast its trend, a designed method based on gray system theory to create the model of tailing dam saturation line is presented.