this paper study the temperature rise of hydration, the time of reaching the maximum temperature and the heat of hydration with composite admixture.
本文系统研究了复合胶凝材料的水化温升、水化温峰出现时间和水化热。
but, concrete placement temperature, surrounding temperature and the heat of hydration of cement, they take a more affection on lining thermal stress.
混凝土的浇筑温度、环境温度以及水泥水化热对温度应力的影响十分显着。
it was indicated that the temperature of cast-in-place concrete and the heat of hydration of different additive had great influence on temperature of soil around the pile.
研究表明砼浇注温度、不同外加剂组合水化热放热量对桩壁土体温度有显着的影响。
as for hydraulic tunnel lining concrete, thermal stress is one of important factors that cause concrete cracks, due to the heat of hydration of cement in the construction period.
对于水工隧洞衬砌混凝土,在施工期由于水泥水化热作用,温度应力影响显着,是产生混凝土结构裂缝的重要原因之一。