The push to manage more wells with fewer people at the wellsite presents numerous challenges from organizational and human factors perspectives.
想要在井场以更少的人管理更多井,则无论是从组织上,还是从人的因素上都提出了许多的挑战。
The application in the wellsite shows that the new drilling fluid system effectively solves the problems of bore-hole stability and satisfies for the drilling operation of Tanggu 5 well.
经现场应用表明,该体系舱有效地解决堂古5井四开井段盐膏层易溶解、易垮塌造成的井壁不稳定问题,满足了堂古5井的鉆井施工要求。
The practice shows that the method is a relative good one for wellsite logging personnel interpretation in the coring interval.
实践证明,利用此方法可为现场录井人员对取心段的解释提供相对準确的数据。
From the point of wellsite mud logging, the paper set forth mud logging characteristics and distinguishing features of major strata, summed up and concluded out understanding on st...
从现场录井的角度详细阐述了地质录井的特点以及主要的地层鑒别特征,归纳总结出对地层层序、厚度变化的认识及对外工作体会。
Sensors and motor controllers interface with a site communications box, which transfers data via satellite in real time between the wellsite and data servers, both of which can be remotely controlled.
传感器和电机控制设备与现场通信盒相连,通过卫星在井场和服务器间传输数据,二者均可远程控制。
It proves by the examples that the method is correct, fast and effective, it can provide experience for wellsite operators to determine palaeo water flow direction quickly.
通过应用举例,证实该方法準确、迅速、有效,为现场工作人员提供了快速确定古水流方向的经验。
Construction of wellsite composite information platform is the necessity for petroleum geologic exploration and development drilling.
构建井场综合信息平台是现代石油地质勘探与开发鉆探的需要。
An equally important part of executing the field program is managing wellsite operations.
现场操作的另外一个重要组成部分就是现场操作程序的有效管理。
It has certain significance to analysis bit wearing and predict wellsite logging.
这对录井现场鉆头使用情况的分析及预报具有一定的指导意义。
As to the origin and the mechanics of total gas curve 「negative shift」 from TDC comprehensive logging unit, we have an initial recognition of it by theoretical and wellsite test.
对于TDC—综合录井仪的气测全量曲线「负漂」成因机理,通过理论分析和现场试验,有了初步认识。
Baker Hughes assigns a dedicated wellsite coordinator and project manager responsible for overseeing the project, resulting in better execution efficiency and improved overall communications.
贝克·休斯公司会派驻一名兼管井场作业协调的项目经理来负责监督方案实施,保障作业队伍内部的有效沟通,进而确保方案更好的实施效果。
The efficiency gains are made possible by higher logging speeds, reduced set-up and calibration times, and faster turn-around on wellsite processing.
更高的测速、更少的组装与刻度时间以及更快的现场处理周期使得效率得以提高。