In this paper, we study the cyclic scheduling problem with electroplating lines where products are loaded into the system at one end and unloaded at the other end.
本文研究了产品在系统的一边装载、而在另一边卸载的电镀线周期性排序问题。
The aim of this work is to propose an effective method for the solution of the cyclic scheduling problem of boiler system with decaying performance.