addition of desalter drum, removal of v105 mixer and selection of the right emulsion breaker ere are extremely necessary for the good operation.
增加脱盐罐、拆除混合器v105、加强破乳剂评选等措施是非常必要的。
th ere are two parts in the controller design:one is the design of the fuzzy neural networks sliding mode controller(fnnsmc) and the other is the design of the linear feedback system.