excavation work中文,excavation work的意思,excavation work翻译及用法

2025-11-23 20:56 浏览次数 11

excavation work

英[ˌekskəˈveɪʃən wə:k]美[ˌɛkskəˈveʃən wɚk]

挖土工程

excavation work 片语

片语

earth excavation挖土工程;土方开挖

excavation work 例句

英汉例句

  • currently, hadi is the european fund for assistance at the scene of the excavation work could be excavated high pounds of property.

    目前,哈迪正在向欧洲基金申请援助,对这一现场进行挖掘工作,可能将挖掘出高额英镑的财物。

  • but, through the recent years, the findings of archaeological excavation work have revealed that paper made first of silk and then of hemp had existed long before tsai-lun「s time.

    但是近些年来,由于考古发掘工作所发现的汉代丝质纸和麻质纸都存在于蔡伦以前,某些科学技术史工作者便作出了颇不一致的论断。

  • ditching includes all excavation work required to provide a ditch of the specified dimensions and depth of pipe cover.

    挖沟指为提供规定尺寸和管子埋设深度的管沟所需的全部挖土工作。

  • in this paper, the excavation work of deep foundation pit for the north concrete anchor of south branch of runyang bridge is introduced.

    介绍了润扬大桥南汊北锚碇深基坑工程开挖实例。

  • 4 according to changes in the market to adjust their ideas, actively follow up the customer」s dynamic, in-depth excavation work for customers.

    根据市场变化调整自身工作思路,积极跟进客户的动态,进行客户的深入挖掘工作。

  • he and his team have barely scratched the surface and the project will require many years of excavation work before it is completed.

    他和他的团队还没有触及地面,该项目将需要许多年的挖掘工作才完成。

  • summary: quicksand layer appears in the sinking and driving engineering will give well engineering excavation work caused a certain degree of interference, which can even lead to security incidents.

    论文发表网-摘要:井巷工程中出现流沙层,会给井巷工程的挖掘工作造成一定的干扰,严重时甚至会导致安全事故。

  • this is the first time that china has conducted undersea excavation work in the open seas.

    这也是中国第一次在公海海底进行文物发掘工作。

  • the application of well-point dewatering in deep excavation work and construction example;

    本文结合具体工程,阐述了井点降水计算方法的实际应用。

  • the mechanical pre-cutting method used in soft ground is a kind of preparative support, it allows tunnel excavation work to be conducted efficiently under the safe pre-lining.

    软土中的机械预切槽法是超前支护的一种,在预筑拱的保护下可以安全高效地开挖隧道。

  • the plinth foundation excavation work was divided by two stages the first one was ordinary excavation, the second one was rock excavation.

    趾板基础开挖分两期进行,一期为一般开挖,二期为巖石开挖。

相关热词