These facts are used to present a warning in the M3 Business Engine.
在M3业务引擎中,会使用这些事实项实现警告功能。
M3 rose by 11.5% in the year to January, nearly three times as fast as the 4% or so rate of nominal GDP growth that is consistent with 2% inflation.
M3比1月份上升了11.5% %,这差不多是在名义GDP大约以4%增长且通胀应维持在2%的时候的三倍速度。
The chart below shows how M3 has declined almost 6% year on year.
下图表明了M3是如何的在过去几年每年下降几乎6%。
If you need to win the race, it is better to drive BMW M3 than Ford Focus.
如果你要赢得一场赛跑,开宝马M3比福特·福克斯要好。
I went back to the M3 which was still charging, and plugged the base station into my home network.
之后我又转到正在充电的M3电话,将它的基站接入我的家庭网。
A new working paper from the ECB concludes that portfolio shifts of this kind have made M3 a poor guide to even medium-term inflation.
欧洲央行的一份新研究报告得出结论,这类投资组合的变化使得M3成为了一种甚至对中度通胀都显得拙劣的指标。
M3 was about $10.3 Trillion at the time.
在那个时候M3大概10..3万亿美元。
Odds are, a new M3 will trade in for at least $26, 000 five years from now, a total depreciation of 56%.
一辆新的M3五年之后可能还可以至少一$26,000,贬值56%折价出售。
In order to be eligible, they must have worked at the company for at least three years and be in P8 (expert) or M3 (senior manager) positions or lower.
为了有资格,他们必须在公司工作至少三年,职位在P8(专家)和M3(高级经理)级别或较低职位。
INVISIO M3 offers unsurpassed comfort and fit for the professional user with a mission critical need to communicate in extreme environments.
INVISIOM3提供了一个关键任务需要在极端环境中进行交流专业用户无与伦比的舒适和健康。
I'd like to share with you another story I just heard, from woman in the M3 RACE.
我想和你们分享另外一个故事,讲述的是来自M3 Race公司的一位女性。
The chart above shows the M3 money supply (Green Line).
上面的图表显示了M3货币供应量(绿线)。
The Fedstopped publishing M3 in 2006, claiming, among other reasons, it wasunimportant and too time consuming.
美联储自2006年起就不再公布M3数据,声称因为M3不重要且计算太耗时,当然还有其他理由。
M3 was one of two Nasa instruments among 11 pieces of equipment from around the world on Chandrayaan-1, which was launched into orbit around the Moon in October last year.
于去年10月发射进入绕月轨道的月球初航1装配了由世界各国提供的11件探月设备,月球矿物制图仪的是由美国宇航局提供的两个仪器之一。
Basic low-level intelligence, the type needed to choose the best travel routes and avoid obstacles, are also key parts of the M3 program.
M3项目的关键部分还将包括基本的低级智能、最佳路线选择和避开障碍物等。