master schedule中文,master schedule的意思,master schedule翻译及用法

2026-03-21 19:21 浏览次数 16

master schedule

英[ˈmɑ:stə ˈʃedju:əl]美[ˈmæstɚ ˈskɛdʒul]

主要图表, 综合图表;设计任务书;主要作业表

master schedule 片语

片语

design specification设计规范;设计规格;设计任务书;设计细节

Master Production Schedule Executive主生产计划

Master Production Schedule主生产计划

master production schedule planning主生产计划

design program设计任务书

Master Production Schedule Entry主生产计划输入

master r schedule主要图表

master programming schedule主程序日程表

master construction schedule plan施工总进度计划

Master Sanitation Schedule检查卫生清洁主计划表

Master Production Schedule List主生产计划列表

master schedule 例句

英汉例句

  • figure 10: sample master schedule that has the overall construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.

    图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。

  • is the master schedule planned and managed at the site leve?

    在现场主(总)计划是否被策划并得到管理?

  • using this protocol, mechanism of time synchronization was designed, which included communication model, communication timing, method of master schedule and slave real-time data exchange.

    基于该协议设计了面向数控系统应用的时钟同步机制,该机制包括通信模型、通信时序、主站调度和从站实时数据交换方法。

  • maintain the job-boss. control the master schedule of production.

    保持工作的老板。控制总表生产。

  • indoctrinate the importance of always having a feasible master schedule in place.

    灌输始终有一个可行的主计划及时到位的重要性。

  • ensures that the appropriate master schedule is always loaded that meets the customer requirements and minimizes jabil liability.

    确保计划部至始至终导入的是符合客户需求和最大限度地减少捷普公司责任的主计划。

  • requires master schedule planning and performing work-in-process storage, handling, transportation, and time phasing of components.

    它需要制定总的日程计划和承担在制品的储备、搬运、运输以及分时间段安排零部件。

  • if necessary, two parties may adjust any items specified herein according to the master schedule of the contract plant through discussion.

    如有必要,双方可根据合同项目的进展情况通过协商调整本附件所规定的任何事项。

  • supporting the project master schedule establish and control during the entire lifetime of the project.

    协助项目经理对整个项目进度的制定、控制和管理工作;

  • on top of those important goals, i have also complied with the important milestones defined by the overall master schedule at each six-week point.

    在这些重要目标之上,我还照做了每个六周的整体综合时间表定义的重要里程碑。

  • requires master schedule planning and performing work-in-process storage, handling, transportation, and time phasing of components.

    需要总日程计划和在制品存储、搬运、运输和分时间阶段安排零部件。

相关热词