pilot run中文,pilot run的意思,pilot run翻译及用法

2025-10-09 12:30 浏览次数 9

pilot run

英[ˈpailət rʌn]美[ˈpaɪlət rʌn]

初步操作试验;[机] 试运行

pilot run 片语

片语

Engineering Pilot Run Phase作阶段

Pilot-run review record试产及其评估记录

th Pilot Run执行第二次试运行脚本

new product pilot run新产品试产

pilot run review OK试产评审

pilot plant run中间试验

pilot-run line试验生产线

pilot t run初步操作试验

pilot run 例句

英汉例句

  • participate in the new product launch, ensure pilot run and mass production of the new product smoothly.

    参与新产品项目的实施,保障新产品试验及大批量生产顺利进行。

  • he/she will join in npi team before pilot run at least.

    他/她至少应该在试生产前加入新产品导入团队。

  • warehouse manager may assign relative person as contact window for new product beta build and pilot run during npd period.

    仓库经理应该在新产品期间指定相关员工作为联系窗口负责新产品物料。

  • mom should assign production me to join in npi team before pilot run at least.

    制造部经理应该至少在试生产前分配制造部制造工程师加入新产品导入团队。

  • the design and pilot run of a contact-oxidation facility to treat print-dyeing wastewater are presented.

    本文介绍了采用生物接触氧化法处理染色废水的设计与工程试运转。

  • coordinate qualification team member on parts verification with npi manufacturing engineer during pilot run period.

    协调部品认证/本地化团队内部和新产品导入工程师一起在试生产期间确认部品。

  • martínez-delgado and colleagues recently completed a pilot run using four small robotic telescopes in new mexico, california, and southern australia.

    最近,马丁内斯-德尔加多和同事在新墨西哥州、加利福尼亚州和澳大利亚南部用四架小型机器人望远镜完成了试运行。

  • planner will arrange pilot run schedule based on manpower and material, will coordinate with mfg to finish pilot on time.

    计划根据生产耳目力,物料环境安排试产,并跟催生产的进度。

  • support mpm on new product pilot run and improvement till mass production;

    协助mpm及生产部内部预加工区域新产品自试产至大规模生产的改善;

  • the yanfang line, beijing「s first driverless subway line connecting the city」s southwest suburbs to its central urban district started its first pilot run on wednesday morning.

    本周三早上,连接西南郊区和中心市区的燕房线--北京第一条无人驾驶地铁线路--开始第一次试运行。

  • mom should assign production me to join in npi team before pilot run at least.

    制造部经理当该至少在试生产前分配制造部制造工程师加入新产品导入团队。

  • participate in the pilot run of new models, track & solve the problems during manufacturing.

    参加新产品的试生产,跟蹤和解决生产过程中出现的问题。

  • provide technical support to manufacturing during pilot run and production start-up.

    为产品生产试运行期间和生产启动时提供技术支持。

  • mom should allocate production me to join in npi tefeel before pilot run perhaps.

    制造部经理应该至多在试坐蓐前分配制造部制造工程师加入新产品导入团队。

  • coordinate qualification team member to update sourcing items status in material tracking sheet weekly before each phase production such as beta build, pilot run and ramp up run.

    协调部品认证/本地化团队内部,及时更新材料跟蹤表格中的本地化部件状态。

  • complete npd step on time, these step include operator training, mfg process audit, pilot run report, mfg stand report, etc.

    完成npd数据库中要求的文件和步骤,包括操作人员培训,制造流程审核,试生产报告,制造标準报告等。

相关热词