the aim of complex structural analysis on foreland thrust belts, which is based on a rational interpreted seismic profile, is to determine the mechanisms, process, rate and timing of deformation.
本文依据面线理构造特征和相关的巖矿测试结果,对大背坞金矿田控矿构造带进行了合理的构造解析,建立了与区域构造发展相对应的构造变形相,分析了其与成矿的关系。