by employing large concrete buttress and anchorages, the reinforcement measures are proposed for the stability of this arch dam.
通过研究,建议采用垫座及锚索等加固措施,使大坝整体处于平稳状态。
this paper analyzes the temperature, deformation, stress, leakage and uplift pressures under the dam in huanren concrete buttress dam.
本文系统的分析了桓仁大头坝的温度、变形、头部应力、漏水和坝基扬压力。
concrete buttress dams when subjected to severe shaking have developed horizontal cracks at the elevation high in the dams where the downstream buttresses intersect the vertical 「chimney」 section.
混凝土伏扶壁大坝受到强震时,容易在大坝高处形成裂缝,在那里下游坝面扶壁横贯垂直的「烟筒」部分。
sefid rud dam, iran (1990) – concrete buttress
赛非德?鲁德大坝,伊朗(1990年)---混凝土扶壁坝