regulation of bend convex bank channel at river estuary was of great technical difficulties under the prerequisite of not changing the river regime.
河口区弯道凸岸段水深治理,在不改变大河势前提下,其技术难度较大。
the results showed: as long as taking reasonable measures, we can guarantee the water inlet of convex bank fetch top layer clear water to ensure hydraulic power station work in good condition.