cost estimate
成本估算,成本估计
2025-10-08 10:17 浏览次数 7
成本估算,成本估计
cost estimate components造价估算内容
cost final estimate造价结算
Baseline cost estimate基线费用估算
additive cost estimate新增成本估算
temporary cost estimate临时工程概算
SWAG cost estimate成本预估
Should-Cost Estimate应该成本估算
cost estimation成本估算;成本估计
Engineering Cost Estimate工程成本估算
cost price estimate成本价估算
the project「s cost estimate factors into the project」s expected overall cost, and is usually preceded by a modifier that provides some indication of accuracy, such as conceptual or definitive.
项目的费用估算分解为项目的预期总费用,而且一般在前面加一个修饰词,指明估算的準确性,如概念(估算)或确定(估算)。
each tank cost about $40 million to build originally, but nasa could not provide a cost estimate for the post-columbia modifications.
每一个燃料箱在最初制造时耗资0.4亿美元,但美国航天局尚未公布这次改装的费用。
so why is the cost estimate so much higher than wilson「s?
那么为什么马科斯和卡巴约估算的费用比威尔逊的高出这么多呢?
converting a final cost estimate into a project budget compatible with an organization」s cost accounts is not always a straightforward task.
把最终的成本估算转化成与组织的成本报告兼容的项目预算并不是一项简单的工作。
consequently, the contractor may put in the least amount of possible effort for making a cost estimate if it believes that its chance of success is not high.
因此,如果一个承包商认为自己胜出的机会不是很大,他就会花费尽可能少的精力来进行成本估价。
table 5: process improvement cost estimate
表5:过程改进成本估计
specific items in the detailed cost estimate become job cost elements.
详细成本估算中的具体项次成为工作成本要素。
as the staff member gains in-depth insight into the impact of the database field length increase, he can give a better cost estimate for this modification.
通过深入了解增加数据库字段长度的影响,可以更準确地估计这一修改的成本。
the purpose of partial costing is to prevent the system from creating a new cost estimate for a material when costing data already exists.
局部成本的目的是防止当成本数据已经存在的情况下为一个物料创建一个新的成本评估。
the return is based on the cost estimate and the potential revenue estimates. 5
收益是基于成本估计和潜在收入估计的。
this staffing model (or 「map」 if the word 「model」 sounds too formal) will provide input to the overall cost estimate by establishing timing for the costs.
这个人员配备模型(如果「模型」这个词听起来太正式,可换成「图」)将通过对成本适时的评估提供所需的全部成本评估。
the cost estimate for those sites would be delivered to operator within 5 business days following the actual site visit.
承包商必须在实地勘测站点后5个工作日内提交工程的成本估价给运营商。
toyota declined to confirm the reported cost estimate for the recalls, which would amount to a relatively steep 74,000 yen ($844) a vehicle.
丰田方面拒绝承认报道中每辆车将花费相对高达74000日元的估计。
you can now use the sql outline again to see that the cost estimate is reduced just by doing this simple task.
现在您可以再次查看sql大纲,您将看到,成本估计降低了,这仅仅是因为执行这个简单任务。
this paper describes the software project cost estimate model based on rup. based on the survey, a software project cost management system is designed and realized.
在对基于rup的软件项目成本估算模型进行研究的基础上,本文设计并实现了基于rup的软件项目成本管理系统。
the next point reeves makes is about the cost of manufacturing, which generally isn「t considered part of the engineering effort but is part of the overall cost estimate for a engineered artifact.
reeves接下来的观点是关于制造成本的,制造成本通常不算工程的一部分,但是是工件的总体成本估计的一部分。
this article uses the cocomo ii method, becomes the case to the domestic software development cost estimate aspect which may refer.
本文的意义在于使用cocomoii方式,对海内的软件开发成本估算方面成为一个可参考的案例。」);
his cost estimate was way off base, far higher than warranted by current prices for labor and materials.
他的成本估计太离谱了,不合理地远远高于目前劳力和材料的价格。
a cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。