cut and fill中文,cut and fill的意思,cut and fill翻译及用法

2025-08-11 05:59 浏览次数 4

cut and fill

英[kʌt ænd fil]美[kʌt ənd fɪl]

随挖随填;充填开采

cut and fill 英语释义

英语释义

    1. the leveling or gradational process whereby waves, currents, streams, or winds erode material from one place and deposit it near by until the surfaces of erosion and deposition become continuous and uniform in grade especially the action of a meandering stream in cutting from its concave banks and depositing within its loops

    2. the excavating of material in one place and the depositing of it nearby (as in building a road or canal)
    wholly obscured by the construction of two later highways, demanding a considerable amount of cut and fill
    — G. R. Stewart

cut and fill 片语

片语

cut peak and fill vale削峰填谷

cut and fill design挖填设计

cut and fill system分层充填开采法

cut peak and fill valley削峰填谷

cut and fill balance土方平衡

Cut t and Fill挖方和填方

cut and fill mining充填开采

overhand horizontal cut-and fill上向水平分层充填采矿法

cut and fill slops半挖半填斜坡

cut and fill 例句

英汉例句

  • a cut and fill approach was used and the dirt removed for underground parking was used to make the mounds in the landscape.

    利用开凿和装填的手段,把建造地下停车场时挖出的泥土用来作为景观中的小丘。

  • the upward horizontal cut and fill stoping method and the measures for safe mining are recommended.

    推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。

  • fine sand and water filling material and system is suitable for the new technology of panel mechanized cut and fill mining method with upward medium-length blast hole.

    细砂水砂充填材料和充填系统非常适合盘区上向中深孔配套机械化新工艺;

  • so the shortest cut and fill problem(srcfp) is introduced. the objective of srcfp is to find a vehicle route that minimizes the total distance traveled between cut and fill locations.

    这引出了一个最短路径填挖问题,目标是找到一个最小车辆路径,使得整个施工过程的总运输距离最短。

  • the volume of the building is inserted into the terrain respecting as much as possible its original conditions and the earthwork needed for its construction is the result of a cut and fill balance.

    建筑的体量尽量嵌入原有地形以最小化其对联合国遗产区景观的消极影响。对地形的塑造尊重原始地貌并维持填挖平衡。

  • however, in modern construction, cut and fill are evaluated as two separate concepts and calculated separately.

    但在今天的工程规范中,填和挖是分开的,挖一方土和填一方土的工程量需要分开计算。

  • jinchuan company. the final report on the cut and fill stooping measure of the deep holeore breaking phase at no. 2 in jinchuan mine, 1993.

    金川公司,澳大利亚芒特艾萨矿业有限公司。中澳关于中国金川二矿区深孔阶段崩矿嗣后胶结充填采矿法研究最终报告。

相关热词