Minimize staff retraining and ramp-up time through reuse of existing development tools and technical standards
将职员再培训和学习的时间将到最少,这通过复用现有的开发工具及技术标準来实现
We eventually realized that the I&T team needs ramp-up time just like any other technical members of the project team.
我们最终意识到I&T团队需要一定的準备时间,就像其他项目团队的技术成员一样。
This standardization allows for the development of best practices and reduces the ramp-up time when a new developer is hired.
这种标準化允许采用最佳实践的开发并缩短雇用新开发人员时的适应期。
These successes lead led to the anticipated benefits of improved full software verification team (SVT) ramp-up time and improved product quality at full system test entry.
这些成功导致(led)了在完整的系统测试开始时改进了的完整的软件验证团队(SVT)的加速的时间,以及改进了的产品质量的预期好处。
The screenshot was taken after the 20-minute ramp-up time and about halfway through the 30-minute run time.
这个截图是在20分钟快速启动时间之后,在30分钟运行时间一半时截取的。