the laxiwa dam will be in a condition for reservoir impoundment at the end of the year 2008 in accordance with the fixed progress schedule.
根据已经确定的施工进度计划安排,拉西瓦大坝将于2008年底具备下闸蓄水条件。
environmental effect of large reservoir impoundment in carbonate rock area was studied, taking the luojiaao interfluve in geheyan reservoir area as an example.
本文以隔河巖罗家坳河间地块为例,探讨巖溶区水库蓄水的环境效应。
the stability of faults and the influence of water load on stress state of reservoir rock mass after the reservoir impoundment are analyzed.
研究结果表明,库水载荷不可能直接诱发水库地震,而是通过对巖石的软化和断层的润滑间接诱发地震。