The exact location of the electrical filters will be determined during construction of the RF shield and coordinated with the architect, MRI equipment manufacturer, and electrical contractor.
滤波器的实际安装位置在土建阶段就必须由建筑方、MRI设备提供方以及供电系统承包方共同确定。
A secondary interior wall may be constructed inside of the RF shield for support of room finishes.