construction schedule中文,construction schedule的意思,construction schedule翻译及用法

2026-01-09 19:35 浏览次数 15

construction schedule

英[kənˈstrʌkʃən ˈʃedju:əl]美[kənˈstrʌkʃən ˈskɛdʒul]

[建] 施工进度;施工程序表

construction schedule 片语

片语

construction project schedule network diagram网络进度计划

construction comprehensive schedule control施工综合进度

construction overall schedule施工进度计划

Construction progress schedule施工进度计划

construction surveying schedule施工测量方案

Network construction progress schedule施工进度网络计划

construction general schedule施工总进度

construction progress施工进度

Construction Time Schedule施工进度表

construction network schedule施工网络进度

construction schedule 例句

英汉例句

  • the construction schedule and methods of the latter system were put forward.

    提出了干挂石材墻面采用现浇聚氨酯保温隔热系统的施工程序及方法。

  • the functions and characters of the software p3 and its application to work out the construction schedule of a pumped storage power station are described.

    介绍了p3软件的功能和特点以及在某抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

  • standard brick upon the occurrence of these problems, construction will be disrupted, serious impact on the building construction schedule and project quality.

    标砖一旦发生这些问题,施工将被打乱,严重影响建筑物的施工进度和工程质量。

  • construction schedule will be issued when accurate dates for drawings, ofe's is known and after (builder) as finalised all procurement.

    生产进度表将根据图纸上精确的时间进行编制。所有船厂采购物品确定后,明确船东供品。

  • in the control of construction schedule for hydropower projects , risk analysis of the schedule is a key.

    工程施工进度风险分析计算是施工进度控制中的重要环节。

  • the article introduces how to improve the digging efficiency of the working face of stone head in minefield, and discusses the measures to improve the construction schedule of stone head by examples.

    介绍了如何提高矿区巖巷工作面的掘进工效,运用实例说明了提高巷道施工进度的对策。

  • the each time parameter of construction schedule network planning in the graph may be exposed immediately, the total float and the free float of each work especially.

    图上可直接展示施工进度网络计划的各时间参数,特别是各工作的总时差和自由时差。

  • abstract: based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.

    在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。

  • the current research on optimization and uncertainty of construction schedule for hydropower projects is reviewed in this paper.

    综述国内外水利水电施工进度优化和不确定性研究的现状;

  • construction design includes: a list of projects in terms of quantity price (business standard), standard construction techniques, construction schedule and construction plan preparation.

    施工设计包括:清单工程量计算、工程量清单报价(商务标)、施工技术标、施工进度计划及施工平面图的编制。

  • in that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.

    如何科学、客观地确定施工进度计划中各分部、分项工程的持续时间是施工进度计划具有合理性和可行性的保证。

  • this method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.

    该方法在确保施工安全、加快施工进度、降低施工成本方面具有显着的效果。

  • the effect of construction schedule on dynamic investment is analysed. then, the definition of construction schedule risk is given and the mc simulation method for the schedule risk is proposed.

    分析水利水电工程施工进度计划对工程建设动态投资的影响,给出施工进度计划风险的定义,提出施工进度风险计算的mc仿真方法。

  • the paper points out the two forms of single project construction schedule and the different result in using through living examples, and analyzes the reasons.

    工程施工计划是一项复杂的工作,不断增长的复杂因素决定了工程管理人员需要采取新的、从未被用过、检测过的工程施工方法。

  • the augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the white house for consideration.

    奥古斯汀专项研究小组质疑提交给白宫考虑的报告中的成本、设计以及建设计划。

  • in roadbed construction, excessive soil is used to fill subgrade because of weather and construction schedule constraints and other reasons.

    在公路路基施工中,天气及施工工期的限制等原因,会经常遇到采用过湿土填筑路基的情况。

  • during the process from plan to completion, the project team has experienced a series problem center on cost of the building, construction quality, construction schedule and so on.

    在项目从设计团队的笔下理想成为落地实物的过程中,经历了围绕项目造价、施工质量、工期进度等一系列问题的艰难博弈。

  • in this article, authors analyze the construction schedule control principle of steel structure projects, discuss its content and methods, and research its operation and check methods.

    分析了钢结构工程施工进度控制原理,并对钢结构工程施工进度控制的内容和方法进行了探讨,同时对施工进度计划的实施和检查进行了研究。

相关热词