driven pile中文,driven pile的意思,driven pile翻译及用法

2025-09-07 00:43 浏览次数 6

driven pile

英[ˈdrɪvən pail]美[ˈdrɪvən paɪl]

[建] 打入桩

driven pile 例句

英汉例句

  • model tests of large driven pile jacked into sands were conducted to obtain the soil density changes due to the compaction.

    通过砂土中的大型沉桩模型试验,得出了桩周土体相对密度的变化规律。

  • driven pile is widely used in pile foundation and how to get it's ultimate bearing capacity is one of the problem that should be determined at first.

    锤击桩是桩基工程中广泛使用的一种沉桩方法,确定其单桩极限承载力是桩基工程设计中需首要解决的问题之一。

  • installation of a driven pile will generate excess pore pressures in the clay adjacent to the pile. pile capacity mostly depends on the dissipation of the excess pore pressures.

    沉桩过程中桩周土体产生超静孔隙水压力,桩承载力的提高很大程度上依赖于超静孔隙水压力的消散。

  • a new table of axial capacity parameter of driven pile has been compiled.

    在此基础上编制了新的打入桩竖向承载力参数表。

  • time is adopted to analyze excess pore water pressure due to driven pile in clay; and a formula is derived.

    引入时间参数分析在粘土中沉桩时所引起的超静孔隙水压力,给出了考虑固结效应的超静孔隙水压力的解。

  • combining the engineering practice in chaohu jinghu bridge, manual driven pile engineering by railway side and safety protection measures are introduced.

    结合对巢湖金湖大桥人工挖孔方桩的施工实践,介绍了铁路边人工挖孔方桩的施工及安全防护措施。

相关热词