the low volume-weight of the embankment dam is an factor of unsafety of andi reservoir project.
该工程由于坝体填土的干容重偏低,故十分担心其安全问题。
as a general rule of thumb, post-construction settlement of an embankment dam should not exceed 1% of the height of the dam.
普通说来,路基工后沉降地水坝不该超越1%地高度地水坝。
dam safety evaluation of the embankment dam is very important in the dam operation and its management, and its safety evaluation must be based on the observation data during its operation.
土石坝安全评价是大坝运行安全管理中的重要工作,而大坝的安全评价需要以运行期间的观测资料为基础。
sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at chalong hydropower station.
查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
the research results provides important basis for the design of side slope of swelling clay embankment dam and the consolidation and treatment of swelling clay foundation.
研究结果为膨胀粘土堤坝边坡设计以及膨胀粘土地基加固、处理提供了重要的依据。
two main problems in embankment dam construction, earthwork allocation and construction organization plan, are analyzed firstly in this paper.
就土石坝施工中的土石方调配与坝体施工组织设计优选进行了讨论分析。
the key link of embankment dam construction is fil ling and compacting of earth and rock materials and the compaction quality depends on whether the compacting standard is properly executed.
土石坝施工的核心是土石料的填筑压实,压实质量的好坏,关键在于能否正确执行压实标準。
at last, a case study on pubugou embankment dam is made, and the related conclusions is given.
本文最后对瀑布沟土石坝进行了数值分析,并给出相关结论。
chalong hydropower station is located in northern tibet plateau with high elevation and severe cold. the main dam is an embankment dam with concrete face slab at the highest elevation in china.
查龙水电站位于高海拔严寒的藏北高原,主坝为我国海拔最高的混凝土面板沙砾石坝。
an embankment dam in which more than the half of the total volume is formed of compacted fine grained material .
整坝体的一半以上是由夯实的细粒物料构成的堤坝。
the program is competent to conduct the nonlinear time history response analysis and permanent displacement calculation of embankment dam during earthquakes.
该程序可完成土石坝在地震荷载作用下非线性时程响应分析以及地震荷载引起的永久变形计算。
after check and assessment, construction quality for embankment dam with concrete face slab material filling at chalong hydropower station is excellent.
经检查评定查龙水电站面板坝填筑施工质量属优良水平。
the embankment dam project lies in the pingwu of sichuan province, it is the first reservoir electric power station on huoxihe the left beach of fujiang.