Analyze bedrock for construction weathered feature at Jixian Power Plan, make weathered zone classification, and apply to pile foundation engineering design.
分析蓟县电厂基巖构造风化的特征,进行了风化带的划分,并应用于桩基工程设计。
Based on years of work experience, this paper discusses the pile foundation engineering quality problems and control.
本文结合多年工作经验,探讨桩基础工程质量通病与防治。
The issue of pile-soil interaction is the research hotspot and difficult subject in pile foundation engineering for recently several years.
桩土相互作用问题是近年来桩基工程中的研究热点与难点课题。
Abstract: : the pile foundation engineering quality control in the construction of the project is most important, it directly affects the entire building quality of the project.
摘要:桩基础工程的质量控制是工程施工中的重中之重,它直接影响到整个建筑物的工程质量。
According to the theory of grey system, the different time steps model of GM (1 1) in the pile foundation engineering is established, and a testing method of this model is provided.
根据灰色系统理论,首次建立了时间非等步长的桩基工程GM(11)模型,提出了时间非等步长的桩基工程GM(11)模型的检验方法。