the deflection of precast piles and excavation problems induced by pile driving are introduced through an engineering case of pile foundation treatment of a power plant.
this paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.