at present, in the building of new shaft, rock drivage takes 40%-50% of whole project, and the construction takes 35%-50%.
目前,在新井建设中,巖巷掘进工程量一般约占总工程量的40%~50%,施工工期占35%~50%。
the test results show that the better blasting effect and obvious technical and economic benefits in coal rock drivage can be acquired by means of the quasi-parallel cutting method.
实践表明,在煤矿巖巷掘进中使用準直眼掏槽方式,能够取得良好的爆破效果和显着的技术经济效益。
but in the mass, rock drivage in our country is slow and inefficient, which affects the properly conjoining of coal production.
但我国巖巷掘进整体上表现为速度慢、工效低,影响了煤炭生产的合理接续。