Some key factor such as maximum rotor angel value and clearing time are also discussing intensively in this thesis.
对影响算法优化结果的暂态约束门限值、故障切除时间等因素进行了全面的比较和深入的讨论。
The formulae for SMIS are derived and verified by case simulation, the solution of critical clearing time (CCT) of three-phase short fault in MMS is theoretically discussed.
The transient Angle stability margin and critical clearing time are computed by FASTEST under different proportion of dynamic electric load model using in Henan Power Grid.
A direct method considering transient voltage dip is proposed to calculate the critical clearing time (CCT) ensuring that voltages of post fault power system are higher than limit.