hydroelectric station中文,hydroelectric station的意思,hydroelectric station翻译及用法

2025-11-24 03:44 浏览次数 8

hydroelectric station

英[ˌhaɪdrəʊɪˈlektrɪk ˈsteiʃən]美[ˌhaɪdroɪˈlɛktrɪk ˈsteʃən]

[电] 水力发电站

hydroelectric station 例句

英汉例句

  • It can be for reference in which design a supply jet-pump in hydroelectric station and a discharge jee-pump.

    为设计水电站供、排水射流泵提供一定参数。

  • Suction height is an important parameter in hydroelectric station design.

    水轮机吸出高度是水电站设计时必须确定的一个重要参数。

  • Before the Three Gorges hydroelectric station is completed, it is the largest hydroelectric station in the world in generation capacity.

    在三峡电站建成之前,这可是全球装机容量最大的水力发电站。

  • The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.

    贵州大花水水电站碾压混凝土双曲拱坝、重力坝开挖采用深孔梯段微差爆破。

  • Based on the elastic-plastic finite element method and strength reduction method, the stability of the rock slope behind the powerhouse of Jiudianxia hydroelectric station was studied and evaluated.

    采用弹塑性有限元法和强度折减法,对九甸峡水电站厂房后巖体边坡进行稳定性计算分析和评价。

  • The online electrovalency research of 3 gorge hydroelectric station is a very main task.

    三峡水电站的上网电价研究是一个十分重要的课题。

  • The hydraulic turbine efficiency test is important for the hydroelectric station or pump station to operate economically.

    水机效率试验在水电厂或泵站优化经济运行中有重要意义。

  • Plans are being drawn up to build a big hydroelectric station here.

    这里正在筹划建设一座大型水电站。

  • Plans are being drawn up to build a hydroelectric station here.

    这里正筹划建设一座水力发电站。

  • A mathematical model of automatic generation control for hydroelectric station is established, and a solution method to AGC mathematical model on multi-nozzle scoop-type turbines is proposed.

    建立了水电站厂内自动发电控制的数学模型,提出一种针对多喷嘴水斗式水轮机组的自动发电控制模型求解方法。

  • The given example shows that the optimum selection of hydroelectric station construction schemes in view of environmental impact making use of I...

    示例表明,利用熵权理论进行环境影响综合评价,从环境影响的角度对水电站建设方案进行优选是合理、可靠的。

  • Based on the discontinuous deformation analysis (DDA), the stability of the high rock slope behind the power house of Jiudianxia hydroelectric station was studied.

    应用非连续变形分析(DDA)对九甸峡水电站厂房高巖体高边坡进行了稳定性分析研究,建立了DDA块体系统分析模型。

  • Dam for a hydroelectric station on the road bridge in which the terrain, the location of the bridge lifting aspects of the analysis of factors to determine the bridge lifting program;

    针对某电站上坝公路桥所处的地形、地理位置对桥梁吊装方面影响因素的分析,从而确定桥梁吊装方案;

  • A mathematical model of automatic generation control for hydroelectric station is established, and a solution method to AGC mathematical model on multi-nozzle scoop-type turbines is proposed.

    摘要建立了水电站厂内自动发电控制的数学模型,提出一种针对多喷嘴水斗式水轮机组的自动发电控制模型求解方法。

  • The hydroelectric station is nearing completion.

    水电站即将竣工。

  • With the rapid development of hydroelectric project, the influence of hydroelectric station on environment has increasingly been people's focus.

    随着水电事业的迅速发展,水电站工程对环境的影响也受到了越来越多的关注。

  • Middle the former hydroelectric station construction, the gravity dam mostly chooses on new and the complete rock mass, the rock mass quality is high.

    以往的水电站建设当中,重力坝大都选择在新鲜和完整程度好的巖体上,巖体质量较高。

相关热词