The steel platform structure with incorporated pontoons was built first and towed to the lake outside the workshop.
钢质平台结构和一体的浮桥首先制造出来并被拖出车间放到湖中。
This paper presents a brief introduction to the design method of the steel platform structure together with its load combination and SACS program application.