The fifth chapter introduces the methods of system debug and test, analyze the test results.
第五章介绍了系统的调试和测试方法以及结果分析。
Solved the practical problem that runs into in system debug stage, for example, the interference problem in data acquisition, the error eliminating in data acquisition.
在系统调试阶段解决了一些现场遇到的实际问题,如数据采集的干扰问题,采集数据的误差消除问题。
In the end, the whole system debug in the laboratory is introduced, and the simulation results on real data show the new algorithm is reliable.
最后,论述了系统在实验室的联调,以及用湖上实测数据验证了算法的正确性。
The last part is system debug among which includes sub-module test and the overall tests.
第七部分为系统测试,其中包括子模块测试和总体测试。
Also, he takes part in the system debug of the baseband system and the joint of the baseband system and the RF module.
承担了基带系统的联调以及和基带与射频模块的联调的许多实际工作。
To aid in debugging system calls, you can install system debug symbols.
若要帮助调试系统调用,可安装系统调试符号。
Finally, this paper studies the application technique of ISP. The ISPbased system debug technique is proposed in this paper.