storm water中文,storm water的意思,storm water翻译及用法

2026-04-14 10:09 浏览次数 24

storm water

英[stɔ:m ˈwɔ:tə]美[stɔrm ˈwɔtɚ]

雨水;[气象] 暴雨水

storm water 英语释义

英语释义

    1. rainwater produced by a storm
    a stormwater management system As stormwater runs over lawns, streets and other man-made surfaces, it picks up pollutants—phosphorous and nitrogen from fertilizers, bacteria from pet waste and road salt, to name a few—and carries them into local streams and lakes.
    — Delen Goldberg This rainfall "of biblical proportions," as the local newspaper described it, swamped the city in waist-high stormwater.
    — Christopher Cooper and Robert Block

storm water 片语

片语

storm-water drain雨水渠,暴雨水沟

use storm-water利用雨水

storm-water sewer雨水渠

storm-water flow暴雨量

storm-water inlet雨水口

storm high water暴风高潮

storm-water tanks雨水排污

storm water 例句

英汉例句

  • It is an effective solution for treatment of storm water runoff while restoring and enhancing the ecological conditions of the natural habitat.

    这是在处理雨洪径流的同时恢复并加强自然栖息地生态条件的有效方法。

  • Once established, the wetlands designed for storm water management are cost effective with low maintenance requirements compared to engineered structural systems.

    专为雨洪管理设计的湿地系统一旦建立,与传统的排水工程结构系统相比,它将具有低维护性,从而更加经济有效。

  • The Sponge City pilots will hopefully demonstrate that investment in ecologically-designed storm water management practices should be used in all Chinese cities.

    海绵城市试点将展示投资基于生态设计的雨水管理应该应用于中国所有的城市。

  • The sewer system is ancient and poorly designed, combining storm water runoff with sewage in the same piping system.

    下水道系统是古代和设计不当,结合雨水径流污水在同一管道系统。

  • Specifically, that existing roads, schools, storm water drainage, fire protection, police, and emergency medical care are adequate to serve the proposed project.

    具体而言,现有的道路,学校,雨水排水,消防,警察和急急医疗服务是足够的项目。

  • Water used on site generally has high amounts of organic substances from the grapes that make it unsuitable for direct discharge into the storm water system.

    通常在位置上用的水有高数量来自使直接的解除它不适合进入暴风雨水系的葡萄的有机物质。

  • The model simulates storm water process over ground, which initially is dry.

    其次,建立地面径流水动力模型。

  • The storm water management value of the wetlands depends on their size, proximity to built environments and their total number within the watershed.

    湿地雨洪管理的价值取决于湿地的大小、与人造环境的距离以及雨洪流域内的湿地总量。

  • Recognizing that the city's traditional flood defenses as being inadequate for future risks, the city began to access other ways to collect and channel storm water to prevent localized flooding.

    意识到传统的抗洪措施不足以应对未来的风险,鹿特丹开始尝试其他办法,收集并疏导雨水以防地区泛洪。

  • The storm water division sump to be constructed in two times, first construction is for sole-plate and part of wall board; second construction is for wall top plate.

    雨水分流集水井分两次施工,第一次为底板和部分墻板,第二次为墻顶板一次施工。

  • Design storm hyetograph is the essential element for hydrologic modeling analysis and storm water drainage design.

    设计暴雨雨型对水文模式分析与暴雨排水设计是不可或缺的基本要素。

  • The increase of storm water from the newly developed areas in upstream areas overloads the existing pipelines downstream, leaving storm water with no place to go.

    上游地区新增的雨水充满了下游现有的管道,导致雨水无处可去。

  • Engineers build huge storm pipes or sewers to carry the storm water away, but these cause another problem.

    工程师们建造了巨大的雨水管或下水道来把暴雨雨水排出去,但是这些设施会引起另一个问题。

  • Most of the visible roofs will be covered in greenery to slow storm water runoff and significantly reduce the heat island effect of the development itself.

    大多数可见的大楼屋顶都将以绿色植被覆盖,从而降低雨水流速,同时还可以显着降低开发区域的热岛效应。

  • The filter settlement tank to be built at end of ditch. The construction water and storm water is discharged to the creek in chemical industrial zone after settlement.

    排水沟末端设置一个滤水沉淀池,现场施工用水及雨水经沉淀池沉淀过滤后排入化工区河浜内。

  • The results show that the sampling directly at the storm water inlet can avoid interferences caused by the mixed pollution.

    结果表明,直接在雨水口采样可避免雨污混接造成的干扰;

  • Also underway is a program to update the sewage and storm water systems.

    也正在进行之中是一个程序来更新污水和雨水系统。

  • Many municipalities are now tackling this problem by separating their sewer and storm water systems.

    现在许多市政当局,正试着以分割污水、雨水排水系统来解决问题。

  • Drainage systems that were designed to meet the needs of the original service areas are unable to carry extra storm water runoff from newly paved areas in the catchment area.

    为服务原有地区设计的排水系统无法承受从新铺装地区聚集的多余雨水。

相关热词