For fulfilling the instant need of operation training for gas-steam combined cycle unit, the simulator for 390 MW LNG gas-steam combined cycle unit was developed.
为满足对燃气-蒸汽联合循环发电机组培训的需要,研制了390MW液化天然气(LNG)联合循环发电机组仿真机。
This paper analyzed the problems existing in the commissioning of heat recovery boiler and steam turbine in a175MW gas-steam combined cycle generating unit and put forward the improvement proposals.
针对某175MW燃气-蒸汽联合循环机组中余热锅炉和蒸汽轮机调试存在的问题进行分析,提出改进意见。
In accordance with the Jiangsu electricity situation and development needs, the article give a brief conception of building gas-steam combined cycle cogeneration power plant in Nanjing.
文章根据江苏地区近期的用电形势和发展需求,提出了在南京建设燃气-蒸汽联合循环热电联产电厂的设想。
This paper expounds the necessity of developing gas-steam combined cycle units in Guangdong, China as well as the fuel supply for this kind of units.
阐述了广东省引进燃气-蒸汽联合循环机组的必要性,以及该类型机组的燃料供应问题。
Taking a triple pressure reheat HRSG in the gas-steam combined cycle as an example, a general expression of the steam turbine thermal efficiency to coupling parameter with the unfired HRSG is derived.
以三压有再热余热锅炉的燃气-蒸汽联合循环为例,推导出非补式余热锅炉型蒸汽轮机热效率关于耦合参数的关系式,在此基础上得到了燃气-蒸汽联合循环热效率关于耦合参数的关系式。
The discuss on the use of on-line oxygen analysis and monitoring system in 50MW power plant gas-steam combined cycle generating unit of Chongqing Iron & Steel Co.
通过传统和激光氧含量的原理、组成、测量方式、测量结果及维护使用情况的比较,介绍了激光氧含量在50MW燃气蒸汽联合循环发电机组电捕焦上的使用的情况。