side span中文,side span的意思,side span翻译及用法

2026-03-22 09:25 浏览次数 24

side span

英[said spæn]美[saɪd spæn]

边跨

side span 片语

片语

unsymmetrical side-span不对称边跨

high and large side-span高大边跨

connection side span连接边节距

long side span大边跨

side span support边跨支撑

ratio of side-span to分跨比

ballast on side span边跨压重

side span WESTBANK侧孔

side span column边跨柱

side span 例句

英汉例句

  • suspension splay casting is set in the parallel anchors in side span of main cables, and sliding saddle is set in the spatial anchors of main span.

    江心洲右汊大桥缆索系统为空间结构,主缆边跨平行锚固侧设置悬浮式散索套,主跨空间锚固侧设置散索鞍。

  • uncertain factors in construction of continuous girder bridge such as side span joint scheme and different balanced cantilever construction speed are analyzed.

    对施工中的不确定因素,诸如边跨合拢方案和不同桥墩悬浇进度不一致等进行了分析比较。

  • due to the influence of the weight and anchorage zone of the side span splay casting, unloaded cable shape is the shape with splay casting weight.

    因边跨散索套重量及锚固区设置影响,主缆空缆线形即为有散索套重量下的空缆线形。

  • the construction techniques of normal segment, side span closure segment and midspan closure segment are also proposed.

    同时介绍了悬浇箱梁普通梁段、边跨合拢段和中跨合拢段的施工工艺。

  • the steel box girder for the main span was erected by the pulling method by the waterborne platform and the girder for the side span was directly lifted to position by the large capacity crane.

    天津富民桥空间索面自锚式悬索桥施工采用先梁后索法,主跨钢箱梁采用水中平台拖拉法施工,边跨钢箱梁采用大吨位吊车直接吊装施工。

  • from the point of internal force and deformation, the influence of girder joint scheme of side span on construction control is discussed.

    从受力与变形角度讨论了边跨合龙方案对连续梁桥施工控制的影响。

  • in this paper, the closure method of side span and connection of tower and beam in the construction process of jieshi cable stayed bridge are analyzed.

    对宕石大桥施工过程中塔梁联结情况和边跨合龙方法进行了分析和探讨。

  • takeing the side span of chongqing fengjie yangtze river bridge as an example, this article introduces the construction technique for cast in-place of the bridge with high supports.

    以重庆奉节长江大桥边跨为例,介绍其采用高支架现浇的施工技术。

  • the upper end of the side arches (5) has the rigid connection with the side span girders and the lower end has the rigid connection with the main piers (9).

    所述边拱(5)上端与边跨主梁刚性连接,下端与主桥墩(9)刚性连接。

相关热词