In this paper the probabilistic technique of security function method is used to evaluate the spinning reserve requirements of power system.
利用安全函数的概率性分析方法并针对机组启停问题对系统的旋转备用需求进行评估。
In general, twenty percent extra power is the standard spinning reserve on the grid.
一般来说,电网的标準热备用是20%。
The spinning reserve comprises generators running, but not at full capacity .
旋压储备包括在运转中非满载的发电机。
Based on electric energy cost analysis, the principle to determine the optimal number of operating units, the model of optimal distribution and dispatch of spinning reserve and concept of...
In the paper, the layout of spinning reserve scheme is essentially regarded as a risk and multi-objective decision-making problem.
本文认为旋转备用方案的制定实质上是个风险型多目标决策问题。
In this paper, the compensation cost of reactive power and spinning reserve supporting and automation generation control (AGC) is analyzed by economic measuring.
为此本文对无功、备用容量支持、自动发电控制等运行费用进行量化分析和研究。
Therefore, the layout of spinning reserve scheme in the environment of electricity market should pay attention to both the reliability and the economy in power system operation.
因此,电力市场环境下的旋转备用方案的制定需要兼顾电力系统运行的可靠性和经济性。
In this paper, the probabilistic technique is used to evaluate the spinning reserve requirements of the system, that is, the reliability constraint is considered in the model of unit commitment.