seeing that the importance of the bus protection wiring in bus coupler current phase comparison, in this paper an on-load testing verifying its wirings is introduced.
the configuration program of incoming loop, bus coupler circuit, feeder circuit, motor circuit, reactive power compensation and the control power in switchgear was described.