oil-bearing drainage system of the centre water treatment plant of baoshan iron and steel company was built in 1985. due to some problems in the design and equipments, operation was of the influenced.
宝钢中央水处理厂含油排水处理系统于1985年建成投运,由于设计、设备上的一些问题,经常影响正常生产运行。